01 Half an hour
Consult
A conversation about the room, the screen, and what the client wants to be looking at when nothing is playing. Most of it is about the wall, not the mechanism. This is also where I say if the thing being asked for is a bad idea — which happens often enough to be worth mentioning here.
What I need
Roughly what you want to hide, and where.
What you get
An honest read on whether it is straightforward, awkward, or not possible.
02 One visit
Measure
Field dimensions, not plan dimensions. Ceiling depth, joist direction and spacing, stud bays, floor build-up, existing wiring, and how far out of square the opening actually is. On a retrofit I will open a small inspection hole rather than guess, and patch it before I leave.
What I need
Access, and about an hour.
What you get
A dimensioned record of the real conditions, which is yours whether or not you go ahead.
03 2 business days
Specify
The mechanism gets chosen against the measured numbers rather than the brochure. You get the model number, the reason, and the option I did not pick with its price — so the decision stays visible instead of disappearing into a line item called "TV lift".
What I need
The screen model, or its weight and diagonal.
What you get
A written specification, a price, and a second option. Quote holds 30 days.
04 2–5 weeks
Build
Cabinet, leaf or ceiling closure built in the shop in Ephrata. The mechanism is mounted and cycled several hundred times on the bench, loaded, before it goes anywhere near a house. Mechanisms that are going to fail early mostly do it here, which is exactly where they should.
What I need
Approval on the drawing and the finish.
What you get
Bench photographs, and a firm install date once the mechanism has passed its cycles.
05 1–3 days
Install
Set, shimmed, wired, terminated and adjusted until the reveal is even along its whole length rather than just at the corners. Drywall is cut, patched and finished by the same hands. Floors and finishes get protected before anything comes through the door.
What I need
Site access and power. Not much else.
What you get
A working mechanism, a finished wall, and the site left clean.
06 Same day, then again in six months
Handoff
Cycle the mechanism with whoever will actually use it. Label the control paths. Leave the manual override procedure, the spare fasteners and the mechanism documentation on site. Then a return visit after the first heating season, because the house will have moved and the reveal will want a quarter turn.
What I need
Ten minutes of whoever uses it.
What you get
Documentation, a booked adjustment visit, and one phone number for the next ten years.